DRAGOSTUNJË HEPP
DRAGOSTUNJË HEPP Dragostunja HEPP project is under construction. The cascade will consist of two hydro powerplants with respective power of 5 MW and 2 MW. The plants will connect to the grid at Librazhd SST by 35 kV OHL. Implementation start date: 2016 Construction-area covered: 6000 m2 Installed power: 7