RRYPA HEPP

This is the third hydropower plant in Skallë - Cërrujë cascade. This plant has 192 m of gross head and has two vertical pelton units installed.

Implementation start date:

2013

Construction-area covered:

4.000 m2

Installed power:

3.6 MW

Shared: