KLOS SUBSTATION
Klos substation is the grid connecting point of Shkallë - Cërrujë cascade. It has a 15 MVA installed capacity and
connects directly to the OST network with 110 kV OHL .
Implementation start date:
2013
Construction-area covered:
450 m2
Installed power:
15 MVA