KLOS SUBSTATION

Klos substation is the grid connecting point of Shkallë - Cërrujë cascade. It has a 15 MVA installed capacity and connects directly to the OST network with 110 kV OHL .

Implementation start date:

2013

Construction-area covered:

450 m2

Installed power:

15 MVA

Shared: