CËRRUJË 1 & 2 HEPP

Cerruja 1 & 2 are the first two hydropower plants of Shkallë - Cërrujë cascade. These hydropower plants range from 260 to 320 meters of head and have respective installed power of 2.3 MW and 2.8 MW each.

Implementation start date:

2012

Construction-area covered:

7.200 m2

Installed power:

5.1 MW

Shared: