DRAGOSTUNJË HEPP
Dragostunja HEPP project is under construction. The cascade will consist of two hydro
powerplants with respective power of 5 MW and 2 MW. The plants will connect to the
grid at Librazhd SST by 35 kV OHL.
Implementation start date:
2016
Construction-area covered:
6000 m2
Installed power:
7 MW
Shared: